The Central Corridor Light Rail Transit Civil East in St. Paul, Minn., was completed in November 2012...
A historic train station, the site features a new PC Snap-On System (PCP150) metal roof from ATAS International Inc...
The elevated Morgan Street Station in Chicago contains 12,500 square feet that defines the Fulton Market District...
The Plauderville Station of N.J. Transit in Garfield, N.J., is a full-service station as of April 2012 and has high-level platforms making...
In 2009, the decision was made to add green features to the Mid-County Facility, including the use of solar panels...
The Metropolitan Atlanta Rapid Transportation Authority, or MARTA, features 90,000 square feet of 0.032-inch aluminum perforated 7...
Completed in June 2009, the project is made up of a railway station and people mover for the Atlanta airport...
The project features approximately 35 squares of 24-gauge Maxima ADV curved roof panels that were formed on-site by McElroy Metal, in...
The 38,613-square-foot, three building project for the beverage distribution company was started in July 2009 and completed in January...
Architectural firm, WSA Studio, wanted to create a rural image with siding that reflects a board-and batten look and an interior with...
The first thing that travelers now see when entering the United States in Champlain, N.Y...
Cambridge Architectural supplied a metal fabric system of expansive panels of architectural mesh to add style and function to the parking...