CONRAC Central Passenger Terminal Complex and Gateway Automated People Mover Station, College Park, Ga.
Posted
10/3/2011
Completed in June 2009, the project is made up of a railway
station and people mover for the Atlanta airport. For the railway
station, CENTRIA supplied 22,418 square feet of its 22/22-gauge
Formawall Dimension Series 2-inch horizontal metal wall panels in
Silver with an embossed Sundance AM coating; 8,126 square feet of
22/22-gauge Formawall Dimension Series 2-inch vertical metal wall
panels in Silver with a smooth Sundance AM coating; and 3,773
square feet of 22/22-gauge Formawall Dimension Series DS-60
T-Profile 2-inch horizontal metal wall panels in silver with an
embossed Sundance AM coating. For the automated people mover
station, CENTRIA supplied 30,485 square feet of 22/22-gauge
Formawall Dimension Series 2-inch horizontal metal wall panels in
Dove Gray with a smooth Duragard Plus coating, and 8,806 square
feet of 22/22-gauge Formawall Dimension Series DS-60 T-Profile
2-inch horizontal metal wall panels in Dove Gray with a smooth
Duragard Plus coating.
General contractors: Archers Western
Contractors, Atlanta, and
Capital Construction Company, Atlanta
Architects: Atlanta Gateway Designers-
a joint venture between Greshem Smith and
Partners, Atlanta, and Duckett Design Group,
East Point, Ga.
Dealer/installer: Peachtree Protective
Covers,
Hiram, Ga.
Metal wall panels: CENTRIA,
Moon Township, Pa.,
www.centria.com
