Metal Architecture Home

Education

Pingree School Athletics Facility, South Hamilton, Mass.

Metallic Building Co. supplied a metal building system with clear-span metal framing and metal roof panels for the athletics facility at Pingree School, which included connected lean-to, gabled buildings and numerous hip and valley conditions.Metallic Building Co. supplied a metal building system with clear-span metal framing and metal roof panels for the athletics facility at Pingree School, which included connected lean-to, gabled buildings and numerous hip and valley conditions.

Olson Lewis + Architects specified a combination of insulated metal wall systems with steel studs and various wood wall applications for the project. The metal building has a 24-foot, 11-inch eave height, and continuous eave and gable overhangs at perimeters with soffits.

Barnes Buildings and Management Group Inc. installed Metallic Building's SuperLok standing seam metal roof panels and Silvercote LLC's Energy Saver FP insulation system for the 36,150-square-foot project. Additionally, the erector installed Metl-Span's Mesa insulated metal wall panels and S-5!'s Color Guard Snow Retention System. The project was completed in July 2014.

General contractor: C.E. Floyd Co. Inc., Bedford, Mass.
Architect: Olson Lewis + Architects, Manchester, Mass.
Erector: Barnes Buildings and Management Group Inc., Weymouth, Mass.
Insulation: Silvercote LLC, Greenville, S.C., www.silvercote.com
Metal building system: Metallic Building Co., Houston, www.metallic.com
Metal wall panels: Metl-Span, Lewisville, Texas, www.metlspan.com
Snow retention: S-5!, Colorado Springs, Colo., www.s-5.com