by Christopher Brinckerhoff | 1 March 2021 12:00 am
Project Frog Inc. offers a componentized metal building Kit-of-Parts system that enables design and deployment of buildings in short timeframes. All components are designed, fabricated and delivered using Project Frog’s industrialized construction (IC) process, which focuses on a design for manufacture and assembly (DfMA) approach for off-site fabrication and on-site installation. The system’s light-gauge steel wall panels are flexible and easy to assemble, while still having a high level of fabrication accuracy. The metal components are durable, require a low amount of maintenance and produce minimal waste during construction.
www.projectfrog.com [1]
Source URL: https://www.metalconstructionnews.com/products/building-system-is-componentized-1/
Copyright ©2025 Metal Construction News unless otherwise noted.