by Christopher Brinckerhoff | 1 May 2019 12:00 am
As part of a renovation project of Terminal 25 in Port Everglades, Bermello Ajamil and Partners Inc. specified metal mesh with integrated LEDs that can display digital messaging and advertising. In two locations on the cruise terminal, one outside the terminal and one inside, GKD Metal Fabrics installed 2,300 square feet of its Mediamesh with LEDs and 800 square feet of its Tigris metal fabric.
Source URL: https://www.metalconstructionnews.com/projects/terminal-25-in-port-everglades-fort-lauderdale-fla/
Copyright ©2025 Metal Construction News unless otherwise noted.