University of Cincinnati Health Emergency Department, Cincinnati

by Christopher Brinckerhoff | 26 February 2024 6:00 am

[1]
Photos courtesy Kingspan Insulated Panels Inc.

Insulated metal panels (IMPs) delivered a flat, aesthetically modern building envelope in a renovation and expansion project of the University of Cincinnati Health Emergency Department. The 30-year-old emergency department at UC Medical Center increased capacity and patient flow as a result of the Clifton campus revitalization project.

On the1,300.64 m2 (41,000 sf) building, Jostin Construction Inc. installed 1579.35 m2 (17,000 sf) of Kingspan QuadCore Optimo IMPs in Pewter.

Owner: University of Cincinnati
General contractor: Messer Construction Co. Cincinnati, messer.com[2]
Architect: CannonDesign, Chicago, cannondesign.com[3]
Installer: Jostin Construction Inc., Cincinnati, jostinconstruction.com[4]
Metal wall panels: Kingspan Insulated Panels Inc., Deland, Fla., kingspan.com[5]

Endnotes:
  1. [Image]: https://www.metalconstructionnews.com/wp-content/uploads/2024/02/University-of-Cincinnati-Health-Emergency-Department_Feb24_2.jpg
  2. messer.com: https://www.messer.com/
  3. cannondesign.com: https://www.cannondesign.com/
  4. jostinconstruction.com: https://jostinconstruction.com/
  5. kingspan.com: https://www.kingspan.com/

Source URL: https://www.metalconstructionnews.com/projects/university-cincinnati/