The school features more than 1,000 squares (9,290 m2) of McElroy Metal’s 16-inch (406-mm) Medallion Lok metal roof panels with a Hartford Green Kynar resin, in addition to 82 KW of Uni-Solar Photovoltaic laminates from United Solar Ovonic LLC. This is the third of four new school projects planned for the district that features McElroy metal roofs and solar panels from Uni-Solar.
Owner: Brentwood Union School District
General contractor: Lathrop Construction Associates, Benicia, Calif.
Architect: Rainforth Grau Architects, Sacramento, Calif.
Roofing contractor: Pioneer Contractors, South San Francisco, Calif.
Solar contractor: Akeena Solar, Los Gatos, Calif.
Photovoltaic laminates: United Solar Ovonic LLC, Rochester Hills, Mich.,
www.uni-solar.com
Metal roof panels: McElroy Metal, Bossier City, La., www.mcelroymetal.com